国产sm精品全国_最新亚洲精品视频在线_天天看在线视频国产_精品三级不卡在线观看视频

Page Options
>> >>view
Images: Eastward development
2023-11-30

The main line of the Shenzhen-Zhongshan Link was connected on November 28. After its opening to traffic next year, the drive time between Shenzhen and Zhongshan will be reduced from the current two hours to less than 30 minutes, ushering in a new stage of the integrated development of the east and west banks of the Pearl River Estuary. Zhongshan is embracing an eastward development to the future!


1.jpg

November 24, looking down from the above, the west artificial island of looks like a roc spreading its wings on the Lingdingyang waters. (By Miao Xiaojian)


2.jpg

The light shield at the entrance of the west artificial island tunnel is like fishbones, allowing drivers and passengers to adapt to the lighting changes inside and outside the tunnel. (By Miao Xiaojian)


3.jpg

The breakwater and wave wall of the west artificial island. (By Miao Xiaojian)


4.jpg

Construction site of the west artificial island. (By Shen Zhong)


5.jpg

November 28, the last ballast concrete being poured. (By Huang Yijie)


6.jpg

A worker introduces the progress of the subsea immersed tube tunnel construction. (By Miao Xiaojian)


7.jpg

The 6,845-meter underwater tunnel is under internal construction. (By Miao Xiaojian)

Close】 【Print
ICP?Registration?Number:?粵ICP備?11005604號(hào)
Police?Registration?Number:?44200002442868
Website?ID:?4420000052
Sponsored?by:??Office?of?Zhongshan?Municipal?People's?Government
Technical?Support:???Information?Center?of?Zhongshan
Without?written?authorization?from??Zhongshan?Municipal?People’s?Government,?the?content?of?the?site?shall?not?be?republished?or?used?in?any?form.
About Us | Site Map| Privacy Statement| Contact us