国产sm精品全国_最新亚洲精品视频在线_天天看在线视频国产_精品三级不卡在线观看视频

Page Options
>> >>view
100th box girder installed on Shenzhen-Zhongshan Bridge's non-navigable span
2021-12-21

1221-3.jpg


The 100th box girder was successfully installed on the Shenzhen-Zhongshan Bridge's offshore non-navigable span on December 19, with a total erected length of 8,550 meters.


The 100th steel box girder measures 133 meters long, 20 meters wide, and 4 meters tall, weighing 1,780 tons, equivalent to nearly 1,000 cars. China Railway Major Bridge Engineering Group Co Ltd is responsible for the installation.


The Shenzhen-Zhongshan Bridge is about 24 kilometers long. The bridge section spans 17 kilometers, and the offshore non-navigable span is about 11.4 kilometers long. A total of 138 steel box girders and 155 concrete beams are required for the entire project.


So far, fifty-one steel box girders and forty-nine 60-meter concrete beams have been erected. The remaining box girders are expected to be installed by October next year.

Close】 【Print
ICP?Registration?Number:?粵ICP備?11005604號(hào)
Police?Registration?Number:?44200002442868
Website?ID:?4420000052
Sponsored?by:??Office?of?Zhongshan?Municipal?People's?Government
Technical?Support:???Information?Center?of?Zhongshan
Without?written?authorization?from??Zhongshan?Municipal?People’s?Government,?the?content?of?the?site?shall?not?be?republished?or?used?in?any?form.
About Us | Site Map| Privacy Statement| Contact us